方案七
+
  • 方案七

Share to

  • 产品描述
  •   What

      What

      Seal flush from pump discharge through orifice and cooler .

      Cooler added to Plan 11 flush increases heat removal

      Why

      Seal cooling

      Reduce fluid temperature to increase fluid vapor margin .

      Reduce coking

      Where

      High temperature service ,typically less than (350F).

      Hot water over 80C ( 180F).

      Clean ,non-polymerizing fluids

      Preventative Maintenance

      Seal cooler and piping must have air vents at highest

      elevation - ventbefore starting .When using 682 Seal Cooler

      pipe with series flow to maximize heat transfer .

      Use an orifice with a minimum 3 mm ( 1/8inch )diameter .

      Calculate flow rates to size orifice for adequate seal chamber

      flow .Increase boiling point margin with proper orifice and

      throat bushing sizing .Regularly monitor cooler inlet and

      outlet temperatures for signs of clogging or fouling

上一页:

下一页:

产品咨询

请注意:请留下您的电子邮箱地址,我们的专业人员将尽快与您联系!